# Setting Up S/4 Projects Side-by-Side

In certain scenarios, you may need to run S/4Code, S/4Convert, or S/4Accelerate projects side-by-side on the same SAP system. This article provides guidelines for configuring such a setup and best practices for task allocation between the two project types.

> [!WARNING]
> Note
> 
> Please [get in touch with Panaya Support](mailto:support@panaya.com?subject=Set%20up%20S%2F4%20Projects%20Side-by-Side&amp;body=Please%20set%20up%20S%2F4%20Projects%20Side-by-Side%20for%20our%20Panaya%20subscription.%20) to set up S/4 Projects Side-by-Side.

S/4Code Project handles the following -

- ATC corrections
- HANA migration corrections
- HANA performance corrections

S/4Convert and S/4Accelerate Project handle the following -

- All remaining upgrade tasks (including testing)
- ICR for cloned programs and obsolete functions
- SI-related activities

> [!NOTE]
> Note
> 
> The ICR Coverage Report will not be visible in the S/4Convert or S/4Accelerate project when using this side-by-side configuration.

## Recommended Workflow

This dual-project setup clearly separates technical code corrections from broader conversion or acceleration activities while maintaining flexibility and traceability.

![](https://cdn.document360.io/f404076c-de23-4609-848e-2dfd4ef701b0/Images/Documentation/image-4JTPY253.png)