Results (883)
SAP Testing
General
English
Getting Started Testers Getting Started Guide Test Managers Getting Started Guide Defect Managers Getting Started Guide Project Managers Getting Started Guide Videos Testing Cycles Tests Generating Tests with AI Importing Tests Risk-Based Testing Reports Setup Manual Testing Run & Document
Automated Test Details & Tabs
General
English
This article describes the various automated test tabs and fields and how to use the automation state field when building your automation repository. Test Header The test header includes basic information about the test. Automated Test ID  – automatically generated automated
Adding fields to the Tests List
General
English
You can customize the displayed columns for the Tests List view . From within a Project -  Hover over the Tests tab  and select Test List Select List View Click the Select Columns button and check the columns you wish to display
Closing a Project
General
English
In order to keep your dashboard organized, Panaya will offer to close unused projects. Unused projects are projects that have not been accessed for at least 90 days.    Completed Projects Closed projects will be set to Completed  status You can
Cycle Summary Tab
General
English
Use the  Summary Tab in the Tests Tree view to track and monitor each Cycle / Folder / Business Process's progress independently. From within a project, Hover over the Tests tab  and then Test Tree. Highlight any Cycle  and select the
Panaya RDx synchronizer does not launch
General
English
If you were trying to sync SAP Change Requests using the Synchronizer unsuccessfully and a flickering blue box appears on the screen, add Panaya to your trusted sites .
Usage Field for Salesforce
General
English
The Usage field relates to the Org usage extracted, i.e., how often the component is used in the extracted usage time frame -  Frequently Used The top 20% of all used components of a certain type under the same Organization
Ready to Test Rules for Automated Tests Planned Runs
General
English
For Automated Tests, Planned Runs to be ready to test, all of the below should apply - The test is In Scope. For Regulated Cycles - The test has been Reviewed and signed . Cycle is launched (Execution stage) No Open Defects are
Project Status
General
English
The All Projects  view displays a list of all your projects  and their statuses   Project Statuses Active The project is active and accessible. Custom code uploaded for the system will be analyzed and reflected in an Active project's activities
The Change Conflicts Report
General
English
The Change Conflicts report helps you identify Requirements or features currently being developed and impacting the same functional area such as module, package, or application component within a specific Project or Release. From within a project -  Click on the Reports
Working with the ScriptBuilder
General
English
Before you continue To work with our Automation ScriptBuilder, you’ll need to follow the setup article for each user required to create and maintain automation scripts. To open the ScriptBuilder, navigate to an automated test and select the script
Test Managers Getting Started Guide
General
English
As a Test Manager, you oversee and optimize the testing process, ensuring all testing activities align with project objectives. Panaya provides tools to streamline the monitoring of testing efforts and maintain traceability. In this article Preparations for working with Panaya
rdisp/call_system
General
English
If you are unable to set the rdisp/call_system parameter = 1, follow the below instructions. Open up the ZP_RECORD ABAP program. Configure the ZIP_BY_SYSTEM_CALL(1) TYPE C VALUE X in the ABAP program ZPANAYA_RECORD
Generating Tests with AI
General
English
Test creation is now faster and more intuitive than ever, powered by AI. You can expect a seamless, in-context experience that accelerates coverage, reduces friction, and helps teams move from requirements to executable tests in just a few clicks
S/4Accelerate Code Extraction - with a Central Check System
General
English
here. If you have previously extracted & uploaded SI results, these can be reused by checking Use previous SI  | Contact Panaya Support for more details   For the ATC for S/4 HANA RFC Destination, type PANAYA_ATC , and then click
Importing Tests from Another Project, System, or Account with an Excel file
General
English
When importing Tests and Quick Tests from another project, you can import using an Excel spreadsheet. The Excel file option allows you to leverage existing test assets and include -  Copied Test activities from previous projects Duplicated test activities with business
Test Sets
General
English
Automated Tests can be executed on demand , or they can be added to a Test Set for scheduled execution . Creating a Test Set From the Test Sets list Hover over the Tests tab and select Automation > Test Sets . Click on
Latest Test Automation Releases
General
English
This table summarizes the latest Panaya Test Automation releases and links to ScriptBuilder and Agent installation files. Version Type Content ScriptBuilder Agent 26.03.201 Service Pack (Optional) Click here Download Download 26.03.104     Monthly Release Click here Download
SAP S/4HANA
General
English
Test Trend Graph
General
English
You can view a trend graph of Tests  and Test Steps . From within a Project Select the Reports tab Expand the Tests  section and select the  Tests and Steps trend by status report The Trend Graph shows the test activities