# Project Risk Widget

The **Project Risk** widget displays a spider chart that allows you to quickly understand the current risk of all areas of your project.

![](https://cdn.document360.io/f404076c-de23-4609-848e-2dfd4ef701b0/Images/Documentation/image-1639857125097.png) Click on![](https://cdn.document360.io/f404076c-de23-4609-848e-2dfd4ef701b0/Images/Documentation/image-1639857164816.png) to **add or remove** vertices. ![](https://cdn.document360.io/f404076c-de23-4609-848e-2dfd4ef701b0/Images/Documentation/image-1639857135399.png)

Read below to learn more about how each vertex risk level is calculated. **Click**on each vertex in the spider to **drill down**to the list of items.

## **RDx Testing**and **Ongoing Changes Projects**

The following vertices are available for your **Release Dynamix (RDx) Testing**and **Ongoing Changes**projects -

- **Test Plan Coverage**  
The risk level is determined by the number of Workstreams with no covering tests compared to the total number of Workstreams in your project.
- **Tests Assignment**  
The risk level is determined by the percentage of test activities where no tester has been assigned.
- **Overall Testing Execution**  
The percentage of pending test activities determines the risk level (Failed / In Progress / Not Run). This vertex only includes Cycles in Execution.
- **Defects Assignment**  
The risk level is determined by the percentage of High and Critical priority Defects where no development owner or testing owner has been assigned.
- **Defects Execution**  
The risk level is determined by the percentage of High and Critical priority open Defects.
- **Development Completion**  
The number of Workstreams determines the risk level in development status compared to your project's total number of Workstreams.
- **Feature Completion**
- **Change Risk Analysis**
- **Text Execution Risk**

## **Impact Analysis projects**

The following vertices are available for your **Impact Analysis projects** -

- **Correction Assignments**  
The risk level is determined by the number of Correction activities where no development owner has been assigned compared to the total number of Corrections in your project.
- **Corrections Completion**  
The risk level is determined by the number of new and open Correction activities compared to the total number of Corrections in your project.

## SAP S/4HANA projects

Below is the list of vertices that are available for **SAP S/4HANA projects** (**S/4Convert and S/4Accelerate)** -

- **Deleted Transactions Impact**  
The risk level is determined by the number of new and open Deleted Transaction Correction category activities compared to the total number of Corrections in your Project.
- **Simplification Checks Impact**  
The risk level is determined by the number of new and open Simplification Items Correction category activities compared to the total number of Corrections in your Project.
- **Consistency Checks Impact**  
The risk level is determined by the number of new and open Consistency Checks Correction category activities compared to the total number of Corrections in your Project.
- **Workstreams Assignment**
- **Workstreams Tests Execution**  
The risk level is determined by the number of Workstreams with incomplete associated test activities compared to the total number of Workstreams in your project.